Safety and Construction Glossary
Plain-language definitions of the terms in safety and construction paperwork.
UKCOSHHControl of Substances Hazardous to Health Regulations 2002 (UK).USDART rateRate of cases with days away, restricted work or job transfer.USEMR (Experience Modification Rate)A workers' comp multiplier comparing your losses with the average for your industry.JSA (Job Safety Analysis)A step-by-step review of a task's hazards and controls before work starts.AULTIFR (Lost Time Injury Frequency Rate)Lost time injuries per million hours worked.Near missAn unplanned event that could have caused injury or damage but did not.USOSHA recordable incidentA work-related injury or illness that must be entered on the OSHA 300 log.Punch listThe list of work that must be completed or fixed before the owner accepts the project.UKRIDDORUK regulations for reporting serious workplace injuries, diseases and dangerous occurrences.Rough-inThe stage when pipes, wires and ducts are installed before walls are closed.SDS (Safety Data Sheet)A 16-section document from the manufacturer describing a chemical's hazards and safe handling.AUSWMS (Safe Work Method Statement)An Australian document required before high risk construction work.Toolbox talkA short safety meeting held on site, usually 5–15 minutes, on one topic.USTRIR (Total Recordable Incident Rate)Number of recordable cases per 100 full-time workers per year.